Part 145 Certification: A Step-by-Step Guide for New Repair Stations
If your shop wants to perform maintenance, preventive maintenance or alterations on aircraft and components and approve that work for return to service under its own name, you need a repair station certificate under 14 CFR Part 145. The certificate opens doors to air carrier, OEM and international customers, but the process is document-heavy and unforgiving of shortcuts. Here is how it works and how to prepare.
What a Part 145 certificate gives you
A certificated repair station may maintain and alter articles within the ratings and limitations on its certificate and operations specifications, and approve them for return to service (14 CFR 145.201). Ratings cover airframes, powerplants, propellers, radios, instruments and accessories (145.59), and many shops start with a limited rating for specific articles or services (145.61). Choosing the right ratings early matters, because they drive your housing, tooling, technical data and staffing requirements.
The five phases of FAA certification
The FAA certifies repair stations through a five-phase process described in FAA Order 8900.1:
- Preapplication. You submit a Preapplication Statement of Intent (FAA Form 8400-6) to your local Flight Standards District Office (FSDO) and meet with the certification team to review your plans, ratings and timeline.
- Formal application. You submit the application (FAA Form 8310-3) together with the required attachments, including your Repair Station Manual and Quality Control Manual.
- Design assessment. The FAA reviews your documents line by line for regulatory compliance. Most back-and-forth happens here.
- Performance assessment. Inspectors visit your facility to confirm that your housing, equipment, technical data, personnel and procedures match what your manuals say.
- Administrative functions. Once findings are resolved, the FAA issues your certificate and operations specifications.
There is no fixed timeline. A well-prepared, narrowly scoped application moves much faster than one that needs repeated manual resubmissions, but the pace of review is set by the FAA and its workload.
The documents you need
Under 14 CFR 145.51, the application package must include, among other items:
- Repair Station Manual (RSM) meeting 145.207 and 145.209, covering your organization, housing and facilities, capability list, contract maintenance, recordkeeping and procedures.
- Quality Control Manual (QCM) describing your quality control system under 145.211, including inspection, calibration, corrective action and keeping technical data current.
- Training program meeting 145.163, with initial and recurrent training and training records.
- An organizational chart, a description of your housing and facilities, a list of the maintenance functions you plan to contract out, and the articles you intend to work on under each rating.
Most shops also need a controlled set of forms (work orders, inspection records, tool calibration logs and training records) so that the procedures in the manuals can actually be carried out and recorded. A Safety Management System (SMS) under 14 CFR Part 5 is not required for Part 145 repair stations, but many shops adopt one voluntarily (including through the FAA's SMS Voluntary Program), and some customers ask for it.
The FAA's Advisory Circular AC 145-9A, Guide for Developing and Evaluating Repair Station and Quality Control Manuals, is the primary guidance for developing and evaluating RSMs and QCMs. Writing to it from the start saves revision cycles.
Personnel requirements
You must have enough qualified people for the work you do. That includes an accountable manager, supervisors (145.153), inspection personnel (145.155), and persons authorized to approve articles for return to service (145.157). Your manuals must name or describe these roles, and the people you list must actually meet the requirements when the FAA visits.
Where applications get stuck
- Template manuals. Generic manuals that describe tools, procedures or staff the shop does not have are the most common source of findings. The FAA checks that what is written is what happens.
- A capability list that doesn't match. Every article on your capability list must be supported by current technical data, tooling and trained people (145.215).
- Missing technical data. You need current manufacturer data for the articles you work on, and a procedure to keep it current.
- Inconsistent documents. When the RSM, QCM, training manual and forms describe different processes, inspectors notice.
- Facility not ready. Housing, equipment and calibrated tooling must be in place before the performance assessment, not ordered for later.
How to prepare
Start by deciding your ratings and building a realistic capability list. Then confirm your facility, tooling and technical data support it, line up qualified personnel, and write manuals that describe how your shop really operates. A gap analysis of any existing documents is often the fastest way to see what is missing. Finally, keep your manuals consistent with each other, because a single change in one usually affects the others.
Certification is only the beginning. Once certificated, you must follow your manuals every day and revise them as your ratings, people and regulations change.
How AMC can help
Aviation Manuals & Compliance prepares complete Part 145 certification packages: the RSM, QCM, training program manual, forms manual and SMS manual, tailored to your ratings and your shop, along with gap analyses and support through the FAA's review. We prepare the documentation and support you through the process; certification decisions are made by the FAA.
